Norwood Court Example: Site Preparation
Two-thirds of the original 15,000 square feet was taken up by a residential tennis court. This made site preparation easier because the ground was already level and graded. After removing the tennis court asphalt, the entire site was cleared of undergrowth and graded. The foundation for the two-unit townhouse was then excavated, and a partially above-grade basement was built with poured concrete walls.

The original site before prep work

Excavation and prep for basement

Excavation and grading

A solid foundation is critical

Basement footers

Basement footers completed

Pouring concrete for basement

Basement walls poured

The crane for setting the boxes